Solutions

Built for Texas
Power-Intensive Operations

LumenicGrid serves two segments with distinct power profiles and curtailment tolerances. Both benefit from the same underlying technology — GridBrain's real-time ERCOT intelligence.

Segment 1

Texas Bitcoin Miners

Bitcoin mining is one of the most controllable large loads on the ERCOT grid. Miners can curtail quickly, tolerate interruptions, and resume seamlessly — which makes them ideal candidates for demand response and 4CP optimization.

The problem: most miners lack real-time visibility into when ERCOT LMP spikes or 4CP events are approaching. LumenicGrid fills that gap with automated monitoring and curtailment signals.

  • ✓Automated curtailment during ERCOT price spikes
  • ✓4CP window tracking — eliminate surprise annual charges
  • ✓Per-miner or fleet-level load control signals
  • ✓Settlement verification against your ERCOT meter data
  • ✓No hardware: signals integrate with your existing BMS or PDU
Why Mining Loads Are Ideal for ERCOT Optimization
Highly Interruptible
Mining rigs can power off in seconds. No data loss, no process risk.
Large Discrete Blocks
A 50 MW mine has high curtailment value — far more than a small commercial load.
4CP Exposure Is Costly
Annual transmission charges are determined by 4 × 15-minute windows during summer peaks. Missing them is expensive.
LMP Spikes Are Predictable
Grid stress follows patterns. GridBrain models probability, not just current price.
Performance Fee Model
12% of verified savings. Zero if no savings are confirmed against your ERCOT settlement data. You review the Savings Verification Report before any fee is applied.
Workload-Aware Curtailment Tiers
Tier A
Best-Effort Workloads
Batch jobs, training runs, pre-rendering — curtail first and deepest
Tier B
Deferrable Workloads
Processing jobs that can queue — curtail if Tier A is insufficient
Tier C
Interactive / SLA-Bound
Never curtailed — real-time inference, production APIs
Tier classification is configured during the shadow trial. LumenicGrid never curtails Tier C workloads.
Segment 2

Texas Data Centers

Data centers face a harder optimization problem than miners: workloads vary in criticality, latency tolerance, and interruptibility. LumenicGrid's workload-aware curtailment model respects those constraints.

The approach: during the shadow trial, we map your workload profile and assign curtailment tiers. Best-effort batch jobs curtail first. Production APIs never curtail. ERCOT charges are reduced without touching SLA-bound workloads.

  • ✓Workload-tier classification during shadow period
  • ✓Curtailment signals respect production/non-production boundaries
  • ✓AI/ML training run scheduling against LMP forecasts
  • ✓4CP transmission charge management
  • ✓ERCOT settlement data verification each month

What Both Segments Share

Whether you're running Bitcoin miners or data center infrastructure, the same GridBrain intelligence engine is watching your ERCOT exposure.

📡
Real-Time LMP Monitoring
ERCOT locational marginal prices updated every 5 minutes, tracked against your load profile.
📅
4CP Event Tracking
Statistical probability model for coincident peak occurrence. Alerts and curtailment signals sent ahead of estimated windows.
📊
ERCOT Settlement Verification
Monthly reconciliation against your actual ERCOT settlement data — the source of record for all savings calculations.
🔒
Read-Only Shadow Phase
60 days of observation before any live curtailment. No equipment control during the shadow trial.
💰
Performance-Based Fee
12% of verified savings. Zero if no savings are confirmed. You approve before any fee is processed.
📋
Monthly Verification Reports
Itemized report of every curtailment event, ERCOT settlement comparison, and savings calculation.

See What GridBrain Finds on Your Facility

The shadow trial is free, read-only, and runs for 60 days. At the end, you'll have a Savings Validation Report showing your actual ERCOT exposure.

Apply for Shadow Trial →